    Is there a setting so that the verification report will run automatically after a profile/calibration?

    Is there a setting to adjust the patch size on the screen?

    Thanks

    #1876

    Florian Höch
    Administrator
    • Offline

    Is there a setting so that the verification report will run automatically after a profile/calibration?

    Not currently.

    Is there a setting to adjust the patch size on the screen?

    Sure, use the buttons “+” and “-” on the measurement window to adjust its size.